Facaeni Wind Farm
EDP Renewables
EDPR wind farm with 44 Vestas V-112 3MW turbines on a 350ha lot, totalizing an installed capacity of 132 MW. Construction includes 17km of 400kV TL, 33/110kV and 33/115/400kV substations, 50km of roads and 43km of medium voltage 33kV cable trenches and fiber optics.
Type:
Infrastructure, Energies
Country:
Romania
Location:
Facaeni
Start date:
2013
Final date:
2014