Baixa do Feijão Wind Farms
EDP Renewables
4 wind farms of 15 wind turbines of 2MW each, with an installed capacity of 120 MW.
The energy generated is collected by a collector/elevating substation (34,5kV/ 138kV), and is sent by the 138kV transmission line of 19kms to the ICG João Câmara III (138kV/500kV) substation.
The wind farms are composed of 60 wind turbines, 26.000m³ of concrete, 3.000 tons of steel, 25km of accesses, 12ha of platforms, 32km of cable ditches, an office building with 280m2 and the collector/elevator substation, besides the temporary facilities, where the concrete manufacturing unit stood out.
They stand out in terms of cabling systems used such as 20km of High Voltage overhead network, 198 km of MV and LV network, buried cable from 95mm2 to 400mm2, 26km of grounding network cable and 56km of fiber optic cable.
afaplan was contracted to provide the Owner Engineering Services of all the construction of the Parks.
Type:
Infrastructure, Energies
Country:
Brazil
Location:
Rio Grande do Norte, RN
Start date:
2014
Final date:
2016