North Line from Alfarelos to Pampilhosa
Rede Ferroviária Nacional - Refer, E.P.E.
Phase 2 - construction of three overpasses at Km 209 +432, 210 +256 and 211 +328, Parallel Paths and Link.
Phase 3A - construction of two viaducts, with a flyover and their access paths, allowing removing the level crossing between km 225 +363 and an underpass, to eliminate the level crossing at km 225 +535.
Type:
Infrastructure, Railways
Country:
Portugal
Location:
Coimbra
Start date:
2009
Final date:
2010