Serrote Wind Farms
Qair Brasil
Serrote Wind Farms are composed of 49 Vestas 4.2MW wind turbines, totalizing 206 MW of installed capacity, and are located in the municipality of Trairi, in the state of Ceará.
The energy generated is collected/increased in the 34,5/230kV substation that is part of the complex. The project also includes the construction of a 71km 230kV Transmission Line that connects the complex's substation to CHESF's Pecém II Substation, located in the municipality of São Gonçalo do Amarante.
Type:
Infrastructure, Energies
Country:
Brazil
Location:
Trairi, CE
Start date:
2019
Final date:
2021