Mondego Valley Walkways

Município da Guarda


Construction of walkways along 11,553m of extension on the banks of the River Mondego, with the objective of extolling the nature tourism of the region, valuing the landscape and environmental surroundings of the banks of the River Mondego.

 

The project is developed between Videmonte and Vila Soeiro, including 7 walkways, 2 crossings, 2 rehabilitation of bridges, 3 suspension bridges and 1 staircase.

 

Main works:

  • Execution of micropiles;
  • Execution of nails for fixing structures;
  • Supply and assembly of wooden structures (beams, guard, decks);
  • Supply and assembly of metal profiles;
  • Supply and assembly of High Resistance Metal Cables;
  • Supply of Various Work and Maintenance Equipment;
  • Installation of a Slide Mechanism along the Mondego River;
  • Installation of a Radiocommunication Station.

Type:

Infrastructure, Roads and Airports

Country:

Portugal

Location:

Guarda

Start date:

2020

Final date:

2021

< Back