Lagoa dos Ventos and Delfina VIII Wind Farms - ENEL
ENEL Green Power
The Lagoa dos Ventos Wind Farms have a total installed capacity of 1112MW.
Phases 1 and 2 consist of 230 Nordex/Acciona AW125-3.0MW and AW125-3.15MW, HH120m wind turbines, totaling 716MW of installed power. The project includes the construction of two substations, one at 138kV and the other at 500kV. The 500kV transmission line is 90km long and the 138kV transmission line is 20km long, connecting the wind farm to the connection bay at the São João do Piauí substation.
Phase 3 consists of 72 GE 5.5MW wind turbines, adding 396MW of installed capacity to the complex. The project also includes the construction of a 500kV substation, a 44km 500kV transmission line and a connection bay.
Delfina Wind Farms I to VIII
Installation of 8 solar parks in the municipality of Campo Formoso, BA, totaling 210MW of installed power.
Consisting of 90 Vestas V110 2MW 80HH WTGs and 7 sub-parks Delfina I (28 MW), Delfina II (28 MW), Delfina III (28 MW), Delfina IV (8 MW), Delfina V (28 MW), Delfina VI (30 MW) and Delfina VII (30 MW), it has an installed nominal power of 180MW.
The energy generated is collected/elevated from 34.5kV/230kV in the SE, which is divided into two 100MVA transformers, and is evacuated to the substation of CHESF/BA's Juazeiro II complex via the 230kV LT over 91km, crossing 300 private properties.
To access the complex, it was necessary to install 60 km of external access and 57 km of internal access divided into 7 axes, all 6.5 meters wide.
Type:
Infrastructure, Energies
Country:
Brazil
Location:
Lagoa do Barro, PI and Campo Formoso, BA
Start date:
2016
Final date:
2021