Replacement of the Covers of the Platforms of Alcântara-Terra

Infraestruturas de Portugal


Replacement of the platform cover and anti-corrosive treatment of the metallic structure of the Alcântara-Terra station, belonging to the Cintura Line.

Main work carried out:

  • Removing cover in fiber cement: 1691m2
  • Polyurethane Sandwich Panels: 1691m2
  • Alveolar polycarbonate sheet: 750m2
  • Placing of anti-pigeon system;
  • Treatment and painting of the whole metal structure;
  • Repair and painting of wood panels.

Type:

Infrastructure, Railways

Country:

Portugal

Location:

Lisbon

Start date:

2018

Final date:

2018

< Back