Delfina Wind farms I to VII

ENEL


The Delfina Wind Farm, BA, is composed of 90 WTGs Vestas V110 2MW 80HH.

Constituted by 7 sub parks, Delfina II (28 MW), Delfina II (28 MW), Delfina III (28 MW), Delfina IV (8 MW), Delfina V (28 MW), Delfina VI (30 MW) and Delfina VII (30 MW), has installed a nominal power of 180 MW.

The generated energy is collected/raised from 34,5kV/230kV in the Substation which is divided into two 100MVA transformers, and is evacuated to the Substation of the CHESF/BA Juazeiro II complex through the 230kV TL over 91km, crossing 300 private properties.

To access the complex it was necessary to create 60 km of external accesses and to execute 57 km of internal accesses divided by 7 axes, all with 6,5m wide.

afaplan provided Owner Engineering services throughout the Park's deployment.

Type:

Infrastructure, Renewable Energy

Country:

Brazil

Location:

Campo Formoso, Bahia, BA

Start date:

2016

Final date:

2017