Dune Ply in Pedrogão Beach
Município de Leiria
Execution of all work necessary for the protection of beach in the two most affected sections, on a length of approximately 220m in Casal Ventoso and of 180m in Centro Azul, as well as the restoration of the dune rows on the section between these two areas, on a length of approximately 400m.
Type:
Hydraulic works, Seaports and Coastal Protection
Country:
Portugal
Location:
Leiria
Start date:
2014
Final date:
2014