Outfall of Portinho da Costa
SMAS de Almada
The construction of WWTP Portinho Coast, includes a piece of construction, downriver of emissaries and collectors pumping systems, supply and erection of electromechanical equipment and instrumentation. The treatment is divided into two phases: a liquid and a solid.
The tributary to the WWTP will be referred to the work of entry through a tunnel (height-width 1.80me 1.00m) since Trafaria with a length of 520m. The plant serves a population of about 140,000 population equivalent., average flow: 22.400m ³ / day and organic load: 8400 kg CBO5 / day.
Type:
Hydraulic works, Emissaries
Country:
Portugal
Location:
Almada
Start date:
2001
Final date:
2004