PRIO in Lehliu-Gara
PRIO
The plant of Lehliu-Gara has the capacity to process 1,800 tons of rapeseed or sunflower seed and 800 tons of soybeans or rapeseed on a daily basis, operating 8000 hours per year.
The industrial complex also incorporates 15 vertical silos of 10 thousand cubic meters each, and bran warehouses for 32 tons and can produce 316.000 tons of oil and 340.000 tons of bran, processing 750.000 tons of oilseeds.
It also comprises a substation of 110/20KW (which powers the plant) and an aerial power distribution of 110 KW with a length of 4 km, which connects the plant and the public network.
Type:
Buildings, Industrial
Country:
Romania
Location:
Lehliu Gara
Start date:
2007
Final date:
2011