Babadag III Wind Farm

Green Energy Grup SA


Wind Farm in Babadag, Tulcea Region, with 15 GAMESA G97 Turbines, 2 MW each, with a total of 30 MW of installed capacity.

Connection of 3km to the network through UGL of 110kV, linking the DSO Substation, including the modernization of OHL 110kV, changing conductors, 50km Babadag Substation and Tulcea Vest Substation.

Wind farm with 20/110kV electrical substation, about 15 km of internal roads and all MV network between turbines.

Type:

Infrastructure, Energies

Country:

Romania

Location:

Babadag

Start date:

2014

Final date:

2015