Concreting of foundations in Terra Santa Wind Farms completed
2020-05-27
On May 26th, the last concreting of the foundation of the wind turbine took place at Terra Santa Wind Farms, located in Caiçara do Norte, in the state of Rio Grande do Norte, owned by Total Eren and with afaplan's Owner Engineering services. It required 10,150 m³ of concrete and 1,224 tons of steel.

The wind complex is divided into two wind farms, Terra Santa I and II, with a total of 26 Siemens Gamesa wind generators with 3.55MW each, totalizing an installed capacity of 92.3MW.