Several in ASC

2015-04-03

ANA Aeroportos contract afaplan to the Supervision, Environmental Monitoring and Health and Safety Coordination in work phase of 5 contracts at Francisco Sá Carneiro Airport - Portugal.

  • Lot A - Revolving doors on Level 0 of the arrivals
  • Lot B - Lift Installation in Nucleus Vertical South Access (between floors -2 and 3)
  • Lot C - Structural Strengthening tunnel under the track 17-35
  • Lot D - Pavement Cargo Terminal Recovery
  • Lot E - Curbsides Departures and Arrivals

< Back