Several in ASC
2015-04-03
ANA Aeroportos contract afaplan to the Supervision, Environmental Monitoring and Health and Safety Coordination in work phase of 5 contracts at Francisco Sá Carneiro Airport - Portugal.
- Lot A - Revolving doors on Level 0 of the arrivals
- Lot B - Lift Installation in Nucleus Vertical South Access (between floors -2 and 3)
- Lot C - Structural Strengthening tunnel under the track 17-35
- Lot D - Pavement Cargo Terminal Recovery
- Lot E - Curbsides Departures and Arrivals