Visit of Gonçalo Sousa Soares and Flávio Barreiro to the Ventos de Santa Eugenia wind farm

On December 8, 2021, Gonçalo Sousa Soares and Flavio Barreiro visited the construction site of the Ventos de Santa Eugenia wind farm, where the last tower section of the first wind turbine was installed. The total installed capacity will be 518MW, near the city of Irecê in the State of Bahia

< Back