Metal Bridge in Portimão

EP - Estradas de Portugal, S.A.


Casing execution of the pillars P4 and P5 in a range from 2,5 m below the river bed to about 0,5m above the top of the stone level.

Injection of holes with self-leveling concrete. Placing of protection on the riverbed against pillars erosion. Conducting underwater surveys every 15 days.  Daily topographic control of the top of each pillar.

Type:

Infrastructure, Roads and Airports

Country:

Portugal

Location:

Portimão - Algarve

Start date:

2007

Final date:

2008

< Back