Sarichioi and Cobadin Wind Farms in Romania

EDP Renewables


Sarichioi Wind Farm:

Construction of Wind Farm 33MW with 11 Turbines VESTAS V90 3.0MW each, 105 rotor high. In total more than 16,50Km of road connecting all Turbines distributed in an total area of 69he. In this Wind Farm we have the 33/110kV Substation with Control Building. The connection to the National grid is assured by OHL 110kV, with 11,5km and IN-OUT Station to the Nation Grid.

 

Cobadin Wind Farm:

Construction of Wind Farm 26MW with 13 Turbines VESTAS V90 2.0MW each, 105 rotor high. In total more than 20Km of road connecting all Turbines and 13 platforms. In this Wind Farm we have the 33/110kV Electrical Station with Control Building. The connection to the National grid is assured by OHL 110kV, with 1,8km and IN-OUT Station.

Type:

Infrastructure, Renewable Energy

Country:

Romania

Location:

Sarichioi and Cobadin

Start date:

2011

Final date:

2013