Facaeni Wind Farm and Substations in Romania

EDP Renewables


Construction Supervision and Technical Assistance for Wind Farm with installed capacity of 132MW. 44 Foundations for V112 VESTAS Turbines 3MW, around 50km of internal roads, 43km of MV cable trenches 33kV, 17km of OHL 400kV and 2,5km of underground line 400kv for connection to the grid.

Construction of two Substations (1) 33/115/400kV and (2) 33/110kV, all construction included in 350ha.

Type:

Infrastructure, Renewable Energy

Country:

Romania

Location:

Facaeni

Start date:

2013

Final date:

2014