Wind Farms in Portugal

EDP Renewables


Construction of Wind Farms Serra do Leiranco in Boticas and Montalegre with the installation of 12 wind turbines, construction of a substation and switching station of 60kV, Serra do Barroso III in a power increase with the installation of 3 wind turbines, Serra do do Mú in Almodôvar with the installation of 1 wind turbine, Corte dos Álomos in Aljuzur with the installation of 3 wind turbines and overequipment of Guerreiros in Aljuzur with the installation of 2 wind turbines, Armamar with the installation of 5 wind turbines, New Aldeia Nova in Trancoso with the installation of 8 wind turbines, Cabeça Oiro in Trancoso with the installation of 7 wind turbines and Rio de Mel in Trancoso with the installation of 5 wind turbines.

Type:

Infrastructure, Renewable Energy

Country:

Portugal

Location:

Several

Start date:

2013

Final date:

2015