Baixa do Feijão Wind Farms, RN, Brazil

EDP Renewables


4 wind farms with 15 turbines of 2 MW each, and provides a nominal output power of 120 MW. The energy generated by these wind farms will be collected by a collector/step-up substation SE (34.5 kV/138 kV), which will be evacuated to the substation ICG João Câmara III (138 kV/500 kV).

The wind farms are composed of the following: 25938m3 of concrete; 2869 tons of steel; 25 kilometers of access roads; 12 ha of platforms; 32 km of cable trenches; 60 wind turbines; 19 km of High Voltage Aerial Network; a unit of concrete manufacture; an office building of 280m2 and the collector/step-up substation.

Type:

Infrastructure, Renewable Energy

Country:

Brazil

Location:

Rio Grande do Norte

Start date:

2014

Final date:

2016