A7 Motorway Rehabilitation

Ascendi, S. A.


Improvement and reinforcement of the pavements of Motorway 7 (A7) in the section Famalicão/Guimarães – Subsection Selho/Guimarães West. The works develop through the entire section from the km 37+600 (A7) until the km 42+650 from A11. In this section there are several viaducts and under passages, so the improvement solution found passes by milling the pavement with a depth of 0,04m and the replacement of the same height with placing of a wear layer of rough betumine concrete. So that it would be easier to define the work strategy and better understand the several singularities of the layout, the work can be separated in open track (current section) and intersections.

 

Right Lane – Selho/Guimarães:

The work starts at pk 37+600 (A7) and finishes at pk 42+650 of A11. This section is being developed from West to East.

 

Left Lane – Selho/Guimarães:

The work starts at pk 37+600 (A7) and finishes at pk 42+650 of A11.

Rehabilitation of the pavements of the A7, subsection Fafe/Basto. This section with a 2x2 platform, starts around PK 56+400 and finishes about PK 76+400 – including the Basto's intersection – presenting an extension of 20 km.

Type:

Infrastructure, Roads and Airports

Country:

Portugal

Location:

Several

Start date:

2012

Final date:

2012