Dune Ply in Pedrogão Beach

Município de Leiria


Execution of all work necessary for the protection of beach in the two most affected sections, on a length of approximately 220m in Casal Ventoso and of 180m in Centro Azul, as well as the restoration of the dune rows on the section between these two areas, on a length of approximately 400m.

Type:

Hydraulic works, Seaports and Coastal Protection

Country:

Portugal

Location:

Leiria

Start date:

2014

Final date:

2014

< Back