Cataventos Acaraú, CE Wind Farm in Brazil

GAMESA


Monitoring and Supervision on installation of anchor bolts and grout placement in the Foundation of a wind farm with 14 wind turbines, of 2 MW each, providing a nominal output of 28 MW.

The wind farm is set in a coastal ecosystem "mangrove", putting the installation challenges the foundations, of 3650m accesses, and the passage of 3260m of network cables. The energy generated will be forwarded along 12km of medium voltage transmission line to a substation already built in the proximity of the Bay of connection of Chesf.

Type:

Infrastructure, Renewable Energy

Country:

Brazil

Location:

Cataventos Acaraú, CE

Start date:

2015

Final date:

2017