Water Pipeline in Coimbra

Águas do Mondego, S.A.


LOT A:

Pipeline System Boavista - East Sector II - Installation of 21km of gravity and pumping pipeline of FFD with diameters of 400, 250, 200 and 125mm, construction of three reservoirs of 2500m³ in Lousã, 1000m³ in Fiscal and 1000m³ in Lamas, and a station lift in Sarnadinha.

LOT B:

System Louçainha - Installation of 16km of gravity and pumping pipeline of FFD, PVC and HDPE with diameters of 300, 250, 200, 160, 150, 110, 90 and 75, construction of three reservoirs of 2000m³ in Fonte Fria, 500m³ in Vieiros and 300m³ in Louçainha, two pumping stations in Vieiros and Fonte Fria and a delivery point.

Pipeline System of Ribeira de Alge - Installation 8 km of gravity and pumping pipeline of FFD, PVC and HDPE with diameters of 300, 250, 200, 160, 150, 110, 90 and 75, construction of a new reservoir of 1000m³ in Olival II and the expansion of three existing reservoirs comprising the construction of a new cell of 1100m³ in Alto da Serra, 280m³ in Serra do Mouro 280m³ and 600m³ in Santo António Brás. Installation of two pumping stations in the Olival and Serra do Mouro and renovation of the pumping station of Casal de Santo António Brás and twenty-three delivery points.

Type:

Infrastructure, Urban Hydraulic

Country:

Portugal

Location:

Coimbra

Start date:

2010

Final date:

2012