Outfalls and WWTP of Mutela

SMAS de Almada


Construction of collectors and outfalls, pumping systems and construction of the WWTP in Mutela, including construction, supply and assembling of electromechanical equipment as well as electrical and instrumentation works.

WWTP of Mutela serves a population of approximately 147.900 inhabitants/eq., average flow: 25.992m³/day and organic load: 8.874kg CBO5/day.

Type:

Infrastructure, Urban Hydraulic

Country:

Portugal

Location:

Almada

Start date:

2002

Final date:

2003

< Back