WWTP of Portinho da Costa

SMAS de Almada


The construction of WWTP Portinho Coast, includes a piece of construction, downriver of emissaries and collectors pumping systems, supply and erection of electromechanical equipment and instrumentation. The treatment is divided into two phases: a liquid and a solid.

The tributary to the WWTP will be referred to the work of entry through a tunnel (height-width 1.80me 1.00m) since Trafaria with a length of 520m. The plant serves a population of about 140,000 population equivalent., average flow: 22.400m ³ / day and organic load: 8400 kg CBO5 / day.

Type:

Infrastructure, Urban Hydraulic

Country:

Portugal

Location:

Almada

Start date:

2001

Final date:

2004