Cerro do Lobo Reservoir

Teixeira Duarte - Engenharia e Construções, S.A.


The Cerro do Lobo Hill reservoir is constituted by a rockfill embankment soil, divided into two wings composed of the main element and gate, with recessed membrane.

The materials used in its construction are divided into five zones (A;B;C;D;E) with maximum dimensions of 76,1mm; 300mm; 600mm; 300mm and 800mm. The total volume is about 400 thousand m³.

Type:

Infrastructure, Urban Hydraulic

Country:

Portugal

Location:

Beja

Start date:

2013

Final date:

2014